|
|
|
Retired Section Swansea Docks |
|
|
|
|
|
Waverley entering the dry
dock. |
|
|
|
Ropes out to both quays to
centre her in the dock. |
|
|
|
Waverley resting on the
blocks. |
|
|
|
View from crane. |
|
|
|
Stern view. |
|
|
|
Engine room. |
|
|
|
Plaque showing details of
the first Waverley. |
|
|
|
Main view of engine. |
|
|
|
Bottom end bearing. |
|
|
|
Main crankshaft. |
|
|
|
View of wheelhouse. |
|
|
|
Dry Dock workshops. |
|
|
|
Dry Dock crane. |
|
|
|
An oil tanker on the right
and the Union Titan on the left. |
|
|
|
Heavy load on dry dock
crane. |